Installation requirements vary by equipment type, mounting method, selected configuration, playing surface, and site conditions. Always review the current manufacturer instructions before preparing the site.

Before Installation

Confirm the product model, selected configuration, post spacing, mounting method, footing dimensions, finished height, court clearances, drainage, underground utilities, concrete condition, and required tools.

Permanent In-Ground Systems

Confirm post alignment, footing size, concrete requirements, finished playing-surface elevation, and curing time. Support posts securely while the concrete cures and verify final measurements before opening the equipment for use.

Ground Sleeves and Sockets

Install sleeves and sockets at the correct spacing, depth, elevation, and alignment. Protect openings from concrete and debris. Confirm that removable posts insert, lock, align, and release properly.

Surface-Mounted Systems

Evaluate the existing concrete before installation. Confirm slab thickness, condition, anchor type, edge clearances, mounting pattern, and manufacturer requirements before drilling.

Portable and Removable Systems

Complete all assembly, ballast, padding, locking, and safety steps. Confirm the intended transport route and storage area before moving equipment.

Final Inspection

Verify post alignment, net height, cable tension, hardware, anchors, padding, locks, clearances, and overall stability before use.

For installation-planning assistance, call or text (210) 512-9888 with the product model, configuration, site details, and project ZIP Code.